A contemporary bathroom with a glass-enclosed walk-in shower lined with large gray stone tiles, black fixtures and a light wood vanitySliding glass doors enclose a bright shower stall tiled in white subway tile with a built-in wall niche and chrome fixturesSunlight on a frameless corner glass shower enclosure installed against white marble walls and a matching stone floorLuxurious veined marble walls in a walk-in shower with warm recessed niche lighting, a built-in bench and golden fixturesAn accessible walk-in shower with metal grab bars, a folding wooden seat attached to the wall and a handheld showerheadA bathroom under renovation with exposed wooden studs and freshly applied blue waterproofing on the shower wallsTiling equipment including a manual tile cutter, a level, a sponge and neat stacks of square tile on a subfloorTile samples, hexagon mosaics, glass panels and chrome shower fixtures arranged on a rustic wooden workbench
Nashville and Middle Tennessee · Shower installation and replacement

Showers in Nashville. Built right.

Shower replacement, tub-to-shower conversions, tile, glass and waterproofing. We build every shower as a watertight system, explain it plainly, write the plan down and test every connection.

  • Free Estimate and a written scope
  • 71 services, one accountable team
  • Waterproofed and flood-tested
  • Honest advice on materials
SHOWER NOTE
Waterproofing is everything

Tile and grout are not waterproof. The membrane behind them is.

Test the pan

A flood test finds leaks before tile hides them.

Ventilation matters

A ducted fan keeps grout and caulk dry.

Measure before glass

Frameless doors need plumb walls and exact sizes.

Old home? Test first

Homes built before 1978 may contain lead paint. Older materials may contain asbestos.

Your shower:
The numbers

Every shower service. Every top brand.

A page, a plan and a price structure for each service, with brand pages and official links, free planning tools and resources written for busy homeowners.

0Shower and bath services across installation, tile, glass, waterproofing, fixtures, tubs, planning and commercial work.Each with its own page
0Before and after projects, from tub conversions and grout to glass doors and refinished tubs.Drag the sliders below
0Free tools: budget, tile calculator, size planner, problem checker, door picker, timeline, bids and a quiz.No sign-up needed
Before and after

Same bathroom. A very different shower.

Pick a project and drag the handle. The right side shows the result of the work.

After: a small bathroom with a sleek walk-in shower with white subway tile and clear glassBefore: a small bathroom with an old stained tub with a plastic curtainBeforeAfter
A tired tub turned into a walk-in shower. From an old stained tub with a plastic curtain to a sleek walk-in shower with white subway tile and clear glass.
What we do

Eight service families, one accountable team.

Pick a family to see every service inside it, or start with the services homeowners ask for first.

How it works

From first call to a shower you love.

A simple six-step process with a written scope, careful waterproofing and a final walkthrough.

  1. 01

    Call and describe it

    You tell us what you want or what is wrong with the shower, and we set an estimate visit that fits your day.

  2. 02

    Measure and inspect

    We measure the shower, check the floor and walls for moisture and note repairs and options.

  3. 03

    Plan and choose

    You get a plain written scope with materials, waterproofing and schedule, and help choosing tile and fixtures.

  4. 04

    Demolish and repair

    We protect your home, remove the old shower and repair any hidden damage so the new one has a sound base.

  5. 05

    Waterproof and build

    We set the pan, waterproof, tile or panel the walls, install glass and fixtures and test every connection.

  6. 06

    Walk through

    We clean up, walk the finished shower with you, fix touch-ups and explain how to care for each surface.

Questions

Quick answers.

Is the estimate really free?

Yes. The Free Estimate comes with no obligation. You approve a written scope before any shower work begins.

How long does a shower replacement take?

Prefabricated showers often take three to ten working days. Custom tile showers often take one to three weeks.

What tile is best for a shower?

Porcelain is dense and durable. Large tile on walls and small tile on the floor is a common and practical combination.

What drives the cost of a shower?

Type, size, materials, hidden damage, plumbing and schedule. A written estimate shows exactly where the money goes.

How do I keep my shower looking new?

Run the fan, squeegee after showers, keep caulk in good repair and use pH-neutral cleaners. See our maintenance checklist.

Free Estimate

Ready for a shower you love again?

Tell us about your project and we will call you back to set up a Free Estimate and a visit.

Or call (615) 357-7797 to talk now.

Tell us about your shower

We will call you back to talk it through and set up a visit.

Prefer to talk? Call (615) 357-7797. We never sell your information.

Music City Shower Service provides shower installation and replacement, tub-to-shower conversions, tile and grout work, glass doors, waterproofing and leak repair, fixtures and safety upgrades, bathtubs, bathroom remodeling and commercial and property shower services, including estimates and design help. Brand names belong to their owners, and we are an independent company that is not affiliated with, authorized by or certified by any fixture, tub, tile, waterproofing or glass maker. Calculators, cost ranges, checklists and guides on this site are planning references, not engineering, safety, insurance or legal advice, and only a visit can confirm what a shower needs. Results depend on the existing structure, hidden conditions, products, schedule and the choices you make, so no photograph shows exactly what your shower will look like. Homes built before 1978 may contain lead paint, and older tile, flooring and adhesives may contain asbestos, so testing is recommended before demolition. Accessibility requirements vary by project type, and plumbing, electrical and permit rules vary by city, county and community. We do not perform mold remediation. Prices shown in the planner are ballpark placeholders only and your written estimate is what counts.

Call NowFree Estimate